Hover to read any week. Click a week, or a numbered journal marker, to zoom in.
BIM · IFC3D model
CAD · DWGDrawings
PDFDrawings
Spreadsheet · CUF-XMLCalculation
Planning toolPlanning
DailySite reports
PaperDelivery notes
Email · timesheetsInvoices, hours
LedgerAccounting
retyped between tools
stuck in an inbox
known at month-end
Nobody sees the whole picture until the nacalculatie.
StreamPlanning datawhat, which element, when
StreamExecution datawhat is built
StreamFinance datawhat it cost
Every element, codedExterior wall elementNL-SfB 21 · buitenwandenlinked to its STABU section, which inkoop and execution work from
Layer 1One project record36 homes · timber frame
Cost-control core · whole projectWeek 14 of 26 · today
wk 14
T4 paid wk 12: wanden, €1,275k (plan wk 10)
One line item, bid to cashPrefab timber-frame wall elementsNL-SfB 21 · 4,320 m² · 36 homes
budget and forecast
price gap
meerwerk, billed
held, not paid
The hardest part.
Everything after the Calculator rests on how well it reads and processes the preparation data. The Planner builds on its work next. This is the biggest challenge I am working on.
Layer 3Assistant proposesprepares the work
Layers 1 + 2Record checksagainst every number
YouPerson decidesapprove, change, reject
Cost control + PlannerRecovery plan · week 14 · illustrative
Four steps to win back margin and time. The project leader decides each line.
L3
Specialist assistantsone at a time, starting where the audits show the biggest leaks
Then
L2
Connections and checksyour existing tools feed the record, every number checked
Next
L1
One project recordevery element and every number of the project, connected
Next
Base
Audits with launching contractorsmapping where the numbers break today, on real projects
Now
Why Systm Labs?
1.5×the national bankruptcy rate, for construction firmsCBS, 2024
Dutch construction firms go bankrupt at about one and a half times the national rate (CBS, 2024). When that happens, the founders are not the only ones who pay. Employees and their families lose their income, and subcontractors and suppliers may go unpaid for work they have already delivered.
7 monthsinside a Dutch general contractor, from first bid to final invoiceField research
Last year, I spent seven months inside a Dutch general contractor, researching how its projects ran from the first bid to the final invoice. I saw how much depends on a handful of numbers being right. I later also saw, from up close, what a bankruptcy can mean for the people around a firm. That experience, and the research around it, gave me perspective, conviction and a sense of purpose for what I am building.
95.5%of the data the industry captures goes unusedFMI, 2018
What I observed is not unique to that firm. Margins in construction are thin, and the numbers that would show a project drifting are often already recorded somewhere. Yet an estimated 95.5% of the data the engineering and construction industry captures goes unused (FMI, 2018). As a result, problems mostly surface once the costs have already been incurred.
81 vs 44open positions per 1,000 jobs: construction against all sectorsCBS, 2025
The usual answer is to hire more office staff, but that is difficult because construction has the single highest vacancy rate of any Dutch sector, with 81 open positions per 1,000 jobs against 44 nationally (CBS, 2025).
Systm Labs exists to help general contractors keep track of the health of every project and spot problems early enough to correct course. It does so by giving their teams capacity the labour market cannot supply. The example that follows shows what that could look like on one project.